For Deutsche Glasfaser, a successful HDD (Horizontal Directional Drilling) operation was conducted under the Water Crossing Weser Höxter. This specific project presented challenging conditions due to the complex composition of the soil.
For “Unsere Grüne Glasfaser,” a railroad bore was conducted beneath the Deutsche Bahn in Sohren, located in the Hundsruck Hills range. Achieving the planned 120-meter radius posed a challenge due to the heavy soil class in Sohren, the limited length, and the use of a mud motor alongside the Paratrack measurement system featuring a 7-meter drill head.
Certified Baupartner from Deutsche Glasfaser for LWL, Spleiß und Messtechnik
Groningen-Hamburg The Groningen-Hamburg project is one of our longest routes. For this project, we have blown more than 440 km of glass fibre cables. These cables were blown into an existing gas pipeline. Operations We used a blow-in technique and used several blow-in jets on this long route from Groningen to Hamburg.
Ring Rotterdam For the Dutch Rijkswaterstaat, we installed several handholes and blew in 200 km of fibre-optic cables along the highways in the Ring of Rotterdam. Operations For this project, we used a blow-in technique to provide the Rijkswaterstaat with fibre optic connections. Contact Would you like some more information or
Stadium Euroborg Groningen For the advertising board LED-lighting in the Euroborg Stadium in Groningen, we carried out directional drilling and blew in fibre-optic cables. We also provided glass fibre cables ort he training fields. The glass fibre cable on the training fields is used for performance measurements of the athletes.
Visser Communication Curaçao For a Dutch client, we reconstructed and reconnected fibre-optic cables at the naval base in Willemstad Curaçao. The equipment was shipped and our welder was flown in to do the job. The ships that dock here can now make a direct connection, so they have all the
Steendam For the Steendam project, we laid fibre optic cables in cooperation with the Steendam housing corporation. After the backbone from Siddeburen to Steendam had been laid, the pipes for the home connections were dug by the homeowners themselves. EBC then injected the fibre-optic cables and welded/measured the home connections
Bahnquerungen Wedemark EBC carries out rail drilling from A to Z. This means that EBC provides a complete drilling plan, working drawings, permits, probing and a betra. The HDD drillings are then carried out using a wireline system. With a specialised drilling team, we carry out track boring throughout the
If you could not find what you were looking for, please contact us by phone: +31 50 – 5491003, email: info@ebcgroup.nl or via our contactpage! One of our colleagues will help you as soon as possible.
Kantoor Nederland
Burg. J.G. Legroweg 90
9761 TD Eelde
+31 (0) 50 – 5491003
info@ebcgroup.nl
Kantoor Duitsland
Ottostraße 1
26899 Rhede
+00 49 3222 1096154
info@ebcgroup.de
Copyright 2021 EBC Group | Privacyverklaring | Cookiepolicy
Office The Netherlands
Office Germany