Search
Close this search box.

Visser Communication Curaçao

For a Dutch client, we reconstructed and reconnected fibre-optic cables at the naval base in Willemstad Curaçao. The equipment was shipped and our welder was flown in to do the job. The ships that dock here can now make a direct connection, so they have all the necessary means of communication at their disposal.

Operations

For this project in Curaçao, we have re-laid fibre-optic cables. After that we welded the fibre-optic cables and measured the damping values to ensure the right quality.

Contact

Would you like some more information or do you have any questions? Feel free to contact us by phone: +31 50 – 5491003, e-mail: info@ebcgroup.com, or fill in the contact form on our contact page! We will contact you as soon as possible.